Product LibrarySystem Library
Site guideSign inCreate an accountCreate account
Case study

Ferndown Forest Golf Club

A three colour acrylic sports surface on asphalt for an outdoor pickleball court open seven days a week

Project type
Stadiums, Streetscape & Landscape
Location
Ferndown, United Kingdom
Year
2025
Products
Sports-Cote Premium (Standard Green, Standard Blue, Dark Blue)
Finished pickleball court in three Sports-Cote Premium colours (open the photo larger)
Finished pickleball court in three Sports-Cote Premium colours

The challenge

Ferndown Forest Golf Club built new padel and pickleball facilities, including one outdoor pickleball court and two padel courts. The surfaces had to resist temperature changes, UV and weather without loss of performance or safety. The pickleball court needed good traction, consistent ball bounce and player comfort, to professional safety and durability standards. As the courts open seven days a week, the materials also had to be low maintenance and long lasting.

The DCP solution

Sports-Cote Premium was supplied in three colours and applied in stages over a prepared asphalt base. The asphalt gave a stable foundation. Dark Blue marks the boundary areas, Standard Blue the centre playing area for contrast with the ball and lines, and Standard Green the surrounds. The system gives traction, consistent bounce, comfort, safety and long term durability with little maintenance.

DCP products used

Named in the project Sports-Cote Premium (Standard Green, Standard Blue, Dark Blue) Not in the SpecHub product library. Ask DCP for the current product.

How it was applied

  1. Start from a prepared asphalt base.
  2. Apply Sports-Cote Premium Dark Blue to the boundary areas of the court.
  3. Apply Sports-Cote Premium Standard Blue to the centre playing area.
  4. Apply Sports-Cote Premium Standard Green to the surrounding areas.

The result

The finished court met the requirements for traction, consistent ball bounce, player comfort, safety and long term durability, with low maintenance to suit seven day operation.

More photos

Completed court with green surrounds and blue playing areas (open the photo larger)
Completed court with green surrounds and blue playing areas
Court lines and colour zones after coating (open the photo larger)
Court lines and colour zones after coating
Blue coating applied to the court over the asphalt base (open the photo larger)
Blue coating applied to the court over the asphalt base
Prepared asphalt base before coating (open the photo larger)
Prepared asphalt base before coating

Related case studies